TRE

El Paso: 915 852 9093
Austin: 512 358 4049
110 Mesa Park Drive, Suite 200, El Paso, Texas 79912
6101 W. Courtyard Dr, Bldg 1, Suite 100, Austin, TX 78730

Years: 2014-2016

Client: Checkpoint Ginger, LLC

Location: Sunland Park, New Mexico

Contribution: Land Planning, Platting, Civil Engineering Design, Construction Administration

TRE & Associates, LLC was engineer of record for the land planning, platting and design of the Valencia Park and Valencia Hills developments under the direction of the owner Checkpoint Ginger, LLC. These subdivisions will create 512 single-family lots with additional lots designated for multifamily, commercial, and school site developments. The 380 acre development community is located in Suniland Park, New Mexico.

Design considerations required managing stormwater runoff from 300 acres upstream and conveyance of that flow through the development. Using computer modeling of multiple scenarios and value engineering, a design that incorporated lined channels and storm sewers achieved that goal.

The water and wastewater service provider, Camino Real Regional Utility Authority, required that TRE perform an analysis of their system to confirm it had the ability to provide reliable service and to identify the most beneficial points of connection to the system. Once identified offsite extension of water lines were necessary. These were facilitated within New Mexico Department of Transportation right of way and required bores under major arterial roadways at several locations to reach the locations for connection. 

Back to Our Work

  • Valencia Park Units 1,2,3, and 4; Valencia Hills Units 1 and 2

© 2017 TRE & Associates | Developed by InRadius Systems |