HORIZON REGIONAL MUD EST-4

Year: 2009-2012

Client: Horizon Regional Municipal Utility District (HRMUD)

Location: El Paso County, Texas

Contribution: Civil Engineering Design, Permitting, and Construction Administration

This project involved the design and construction of a 1.0 MG composite elevated storage tank for HRMUD. This tank was part of a larger scope of projects which included water system modeling, route studies, and site selection. The scope of the services provided by principals of TRE included design survey, tank design, design approval and release of escrow of funds through the TCEQ, specification preparation, bidding, construction observation, and construction administration. TRE coordinated with a certified welding and coating inspector for inspection of the tank bowl during construction.



our portfolio

Related Projects

HORIZON REGIONAL MUD 1.0 MG FEEDWATER TANK

HORIZON REGIONAL MUD 1.0 MG FEEDWATER TANK

PNR HIGHWAY 80 WATER TREATMENT AND DISTRIBUTION SYSTEM

PNR HIGHWAY 80 WATER TREATMENT AND DISTRIBUTION SYSTEM

HORIZON REGIONAL MUD REVERSE OSMOSIS PLANT

HORIZON REGIONAL MUD REVERSE OSMOSIS PLANT

HORIZON REGIONAL MUD WATER WELLS AND WELL GATHERING LINE

HORIZON REGIONAL MUD WATER WELLS AND WELL GATHERING LINE